Hardwood Floor Installation: Moisture, Methods and Cost

Hardwood floor installation comes down to three things: controlling moisture before and after the boards go in, matching the installation method to the subfloor, and budgeting with sourced market figures. This guide walks through each so you can plan the job and ask better questions of an installer. For a real quote on your home, book a design consultation with Maine Cabinet Company, which offers flooring, in-home measuring and installation across Falmouth, Yarmouth, Cumberland, Freeport, Portland, Brunswick and Windham.

How Hardwood Floor Installation Works, Start to Finish

A hardwood floor goes in as a sequence, and each step depends on the one before it:

  1. Job site evaluation. The room’s conditions are checked before any wood arrives.
  2. Subfloor preparation. The surface under the floor is made ready to receive it.
  3. Installation. The boards are fastened or glued down using the method that suits the subfloor and the product.
  4. Sanding and finishing. This applies to unfinished wood flooring, which is sanded and finished after it has gone down.

That order mirrors how the industry itself describes the work. The National Wood Flooring Association (NWFA) publishes installation guidelines, and Hardwood Floors Magazine described the 2020 edition as the most comprehensive revision since the guidelines were first published in 1988. According to the same report, the topics include evaluating job site conditions, subfloor preparation and proper installation techniques. This guide does not confirm whether the 2020 edition is still the latest, so check the NWFA for the current version.

Unfinished flooring also needs a pause before the last step. Floor Covering News (David Gross, April 9, 2025) advises allowing unfinished wood flooring to stabilize for five to seven days before sanding and finishing.

Check the Room Conditions Before Hardwood Floor Installation

Wood responds to the air around it, so the room comes first. Brett Miller of the NWFA, writing in Hardwood Floors Magazine in 2017, put the best-performing relative humidity for wood floors at 30 to 50 percent. The same guidance gives a temperature range of 60 to 80 degrees Fahrenheit. Manufacturers publish their own limits for their own products, and those can differ, so treat the product’s instructions as the final word for your floor.

The same article also covers timing. It says heating and air conditioning units should be operating at least five days before delivery of the floors, so the house is already at its living conditions when the wood arrives.

Normal wood moisture content also varies from one region to another. The article gives a dry area such as Nevada, which averages between 4 percent and 7 percent moisture content, as an example. That is an illustration of regional variation, not a figure for any home in Maine.

Moisture Testing and Subfloor Prep: Where Callbacks Start

Testing replaces guessing. Floor Covering News advises using a moisture meter set for the correct wood species, then comparing the readings with NWFA equilibrium moisture content (EMC) tables and the manufacturer’s specifications to confirm compatibility.

The subfloor gets measured too. Hardwood Floors Magazine says the moisture content of the wood flooring and the subfloor should be within 2 percent for plank flooring (boards 3 inches or wider) and 4 percent for strip flooring (boards less than 3 inches wide).

The same publication ties a common defect to this step. It says a common cause of floorboard cupping is excessive moisture on the underside of the flooring, which results from insufficient conditioning of the subfloor panels prior to flooring installation.

One more detail belongs on your installer’s checklist: the expansion gap around the room. Its size is set by the installation instructions for the product you choose, so ask to see those instructions rather than relying on a rule of thumb.

Nail-Down, Staple-Down or Glue-Down: Matching the Method to the Subfloor

The method follows the subfloor and the product:

  • Nail-down or staple-down. Bruce, a flooring manufacturer, describes this as hardwood flooring secured to a wood or plywood subfloor using nails or staples.
  • Glue-down (engineered hardwood). Bruce says you can install engineered hardwood flooring directly over most subfloors, including concrete. That statement is specific to engineered hardwood.

If you are still deciding between solid and engineered boards, the guide to engineered hardwood vs hardwood is the place to start, because the product you pick narrows the methods available to you.

What Hardwood Floor Installation Costs: Market Ranges, Not Our Pricing

Cost questions deserve sourced numbers. Inch Calculator says most flooring contractors charge $4 to $8 per square foot for installation. It also says most homeowners spend around $2,500 to $7,500 to install hardwood flooring in an average living room of 340 square feet.

Read both figures with care. The page shows “Updated Jul 18, 2023” and also refers to 2026 price data, so treat the numbers as a rough market reference rather than a current, verified price. They are national market figures from a cost calculator site, not Maine figures and not Maine Cabinet Company pricing.

For a number that fits your room, book a design consultation with Maine Cabinet Company. For the cabinet side of installation costs, the Kitchen Cabinet Installation Cost Guide is a useful companion read.

Planning Your Install with Maine Cabinet Company

Maine Cabinet Company does bespoke kitchen design, with custom-crafted cabinetry, countertops and flooring designed in-showroom. Its service model pairs in-showroom design with in-home measuring and installation. Its offerings include custom and semi-custom cabinetry, kitchen design and renovation, countertops, bathroom, flooring and design consultation, and it works with homeowners planning a kitchen or bath remodel.

The showroom is at 417 US Route 1, Falmouth, ME 04105, and the phone number is (207) 956-7727. Maine Cabinet Company serves Falmouth, Yarmouth, Cumberland, Freeport, Portland, Brunswick and Windham.

If you are weighing floor materials alongside the rest of your kitchen, the overview of kitchen flooring types is a good next step. When you are ready to talk specifics, book a design consultation with Maine Cabinet Company.

Hardwood Floor Installation FAQ

What humidity is best for a wood floor?

Brett Miller of the NWFA gave a relative humidity range of 30 to 50 percent, with temperatures of 60 to 80 degrees Fahrenheit. Manufacturers’ own limits can differ, so check the product’s instructions.

How is moisture tested?

Use a moisture meter set for the correct wood species. Then compare the readings with NWFA EMC tables and the manufacturer’s specifications. The wood and subfloor should be within 2 percent of each other for plank flooring and 4 percent for strip flooring.

What causes cupping?

A common cause of floorboard cupping is excessive moisture on the underside of the flooring, resulting from insufficient conditioning of the subfloor panels before installation.

Can engineered hardwood go over concrete?

Bruce says engineered hardwood can be installed directly over most subfloors, including concrete. That applies to engineered hardwood only.

When can unfinished flooring be sanded and finished?

Floor Covering News advises letting unfinished wood flooring stabilize for five to seven days before sanding and finishing.

Keep Reading

More on the flooring side of a remodel: hardwood flooring in a Maine kitchen, a guide to popular hardwood floor colors, and wood floor trends.

Hardwood floor installation comes down to controlling moisture, matching the method to the subfloor, and budgeting with sourced market figures. This guide covers room conditions, moisture testing, nail-down and glue-down methods, and cost ranges, so you can plan the job and ask an installer better questions.

Learn How We Can Help

You May Also Like...